The Brewery Floor: Update

Posted by The Brewer on 13th July 2010

The base layer of mud and board is down. The slope is set towards the drain from all quarters. The Redgard is down. The tile is coming soon!!!!!!

Share this:
Share this page via Email Share this page via Stumble Upon Share this page via Digg this Share this page via Facebook Share this page via Twitter
Categories: Events,Improvements
Tags:

Leave a Reply